Every build starts with a site assessment covering slope, drainage, and available footprint. A half court runs roughly 47 by 50 feet; a full court needs 94 by 50 feet. Roanoke’s variable terrain often requires grading before any base work begins, and that grade check determines whether concrete, asphalt, or modular sports flooring is the right base choice for the site.
Once the sub-base is compacted and drainage is confirmed, the base layer goes down. Concrete gives a rigid, low-flex surface suited to heavy use. Asphalt is more forgiving on sloped lots and handles freeze-thaw cycles well. Either base receives a surface coating that controls ball bounce and protects against UV wear and seasonal rainfall.
Regulation line marking, hoop installation, and a final walkthrough complete the scope. The builder checks level, surface slope, and hoop height before sign-off. Perimeter fencing and court lighting can be added in the same scope so the court is ready for evening play without a separate contractor visit.